Skip to main content

Holly Drive Road Construction 2017

Holly Drive from Nemesh Drive to Elks Drive will be undergoing road work through Aug. 18. Access to residences will be maintained with some intermittent closures during construction. Motorists wanting to avoid possible delays should seek an alternative route. RoadRUNNER Transit routes will not be affected.

For more information, call 575/541-2595. The TTY number is 575/541-2182.